Page tree
Skip to end of metadata
Go to start of metadata

On this Page

Overview and Equipment Information

This document is intended to guide the user through installation utilizing the kit numbered according to the document title. A list of associated equipment models including control information and additional installation notes can be found below.

Kit Installation Notes

Status: Active

Product: FasCard F1
Manufacturer: ADC
Start Harness: 2-wire Phase 5 connector
Interface Type: Pulse
Install Type: Card Only
Actuation: Coin Drop - Factory
Coin Sense: N/A
Mounting: Custom Bracket
Chassis: N/A
Readers: 1 Reader
Machine Control: ADC Phase 5


This document assumes the installer has working knowledge of hand tools and of the target machine in question. Physical modification of machine may be required, including modification of machine panels and internal modification to accommodate cables or harnesses. It is recommended that the instructions contained herein be performed by individuals who are qualified to perform these tasks. Card Concepts Inc. takes no responsibility for the accuracy of this document or for any damage that may occur to target machine.

Required Hardware

Card Reader

Part IDDescriptionImage
C-5001
F1 FasCard Reader

Installation Kit

QTYPart NumberDescriptionImage
2C-0134Standoff
1C-0925AMounting Bracket
1C-0925BMounting Bracket
1C-0926Drop Cover
4C-1044NNut
1C-5021Label
1C-5027Label
2C-5101Spade Taps
1C-5336Power Adapter Harness
1C-5344Machine Start Harness
1C-5500-60Power Extension Harness
1C-5602Power Converter
2C-5751Screw

Recommended Tools and Supplies (Not Included)

See LaundryCard Kit Installation Guidelines for more information.

Installation

Confirm machine power is disconnected before beginning installation!

Use caution and appropriate protection to prevent hand and eye injury during installation!

Step 1 - Remove Coin Drop

C-0926C-1044N
Drop Cover
Nut

  1. Remove the existing Coin Drop.
    1. Refer to manufacturer documentation as needed.
  2. Install C-0926 Drop Cover over the cavity left by removing the Coin Drop.

Step 2 - Connect Machine Start Harness

C-5302
Machine Start Harness

  1. Connect the C-5302 Machine Start Harness to the control harness that was previously connected to the Coin Drop.

Step 3 - Install Mounting Bracket

C-0134C-0925AC-0925B
Standoff
Mounting Bracket
Mounting Bracket

  1. Install the C-0925A Mounting Bracket into the Coin Vault.
  2. Attach the C-0134 Standoffs to the C-0925A Mounting Bracket.
  3. Mount the C-0925B Mounting Bracket onto the matching Mounting Bracket.

Step 4 - Final Connections

C-5302C-5500-60
Machine Start Harness
Power Extension Harness

  1. Feed remaining harness ends through mounting hole as described in FasCard Mounting Guide.
  2. Connect the free end of the C-5302 Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.
  3. Connect the free end of the C-5500-60 Power Extension Harness to port 4 (C-5500 Power Harness Connection Port) as shown in the image above.
  4. Connect FasCard reader to C-0925A Mounting Bracket
  5. Program the card reader address as described here: How to Program Address on a FasCard Reader.

Associated Equipment Models

MakeModelPulse LengthSensorControlNotes
ADCAD-33060FalseSingle-Vend (Pulse)Notes