Kit Installation Notes

Installation Kit

Recommended Tools and Supplies (Not Included)

See F2 Reader Mounting Guide for more information.

Installation

Step 1 - Install Mounting Bracket

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.
  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.
  3. Refer to F2 Reader Mounting Guide for further instructions.

Step 2 - Connect Machine Interface Harness

  1. Disconnect the Coin Drop from the Machine Control Assembly.
  2. Connect the C-6124-MDB Machine Interface Harness to the harness connected to the Coin Drop.
  3. Connect the remaining end of the C-6124-MDB Machine Interface Harness to the harness where the Coin Drop was previously connected.

Step 3 - Connect and Mount FasCard Reader

  1. Feed remaining harness ends through mounting hole as described in F2 Reader Mounting Guide.
  2. Connect the black, 10 pin connection of the C-6124-MDB Machine Interface Harness to port 2 (Serial Connection Port) as shown in the image below.
  3. Connect the clear, 3 pin connection of the C-6124-MDB Power Extension Harness to port 1 (Power Connection Port) as shown in the image below.
  4. Connect FasCard reader to base as described in the F2 Reader Mounting Guide.
  5. Program the card reader address as described here: How to Program Address on a FasCard Reader.

Associated Equipment Models