Kit Installation Notes

Installation Kit

Recommended Tools and Supplies (Not Included)

See F2 FasCard Mounting Guide for more information.

Installation

Step 1 - Install Mounting Bracket

  1. Place the C-6700-TEMP Drill Template on the desired mounting location.
  2. Verify included harnesses will reach desired location without encountering interference from internal machine components.
  3. Refer to F2 FasCard Mounting Guide for further instructions.

Step 2 - Connect Power

  1. Tap power from the 24v transformer as described in the Fascard Reader Install - Universal Concepts document using the C-5101 Spade Taps provided.
  2. Connect the C-6208 Power Adapter Harness to the installed spade taps. The remaining cable end connects to the FasCard reader.

Step 3 - Connect Coin Sense Harness

  1. Disconnect the Coin Drop from the Machine Control Assembly.
  2. Connect the C-6250 Coin Sense Harness 3 pin connector to the harness connected to the Coin Drop.
  3. Connect the C-6250 Coin Sense Harness white connector to the Machine Control Assembly where the Coin Drop was previously connected.

Step 4 - Connect Machine Start Harness

  1. Connect the C-5300-NC Machine Start Harness to the Machine Control Assembly where the coin drop was previously connected.

Step 5 - Connect and Mount FasCard Reader

  1. Feed remaining harness ends through mounting hole as described in F2 FasCard Mounting Guide.
  2. Connect the free end of the C-5300-NC Machine Start Harness to port 2 (Serial Connection Port) as shown in the image above.
  3. Connect the free end of the C-6250 Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.
  4. Connect the free end of the C-6208 Power Extension Harness to port 4 (C-5500 Power Harness Connection Port) as shown in the image above.
  5. Connect FasCard reader to base as described in the F2 FasCard Mounting Guide.
  6. Program the card reader address as described here: How to Program Address on a FasCard Reader.

Associated Equipment Models