Kit Installation Notes

Installation Kit

Recommended Tools and Supplies (Not Included)

See F1 Reader Mounting Guide for more information.

Installation

Step 1 - Install Mounting Bracket

  1. Insert the C-0970 Vault Mount Bracket into the Coin Vault
  2. Spread the bracket wings to lock it into place.

Step 2 - Connect Power

  1. Connect the C-5250R2 Power Adapter Harness to the machine 24vac power connector.
    1. Secure the ground wire to a screw located near the rear of the control pan.

Step 3 - Connect Machine Start Harness

  1. Remove the existing Alliance Jumper Plug at H8 and connect the C-0110-CP Jumper Plug to the Machine Control Assembly.
  2. Connect the C-0110-TOP Machine Start Harness to the Machine Control Assembly at H5.
    1. The opposite end of this harness connects directly to the FasCard reader.
  3. Connect the C-5365 Bypass Harness to the appropriate connections to bypass the Coin Box.

Step 4 - Connect and Mount FasCard Reader

  1. Feed remaining harness ends through mounting hole as described in F1 Reader Mounting Guide.
  2. Connect the free end of the C-0110-TOP Machine Start Harness to port 2 (Pulse Connection Port) as shown in the image above.
  3. Connect the free end of the C-5250 Coin Sense Harness to port 3 (Coin Sense Harness Connection Port) as shown in the image above.
  4. Connect the free end of the C-5250R2 Power Adapter Harness to port 4 (C-5500 Power Harness Connection Port) as shown in the image above.
  5. Connect FasCard reader to base as described in the FasCard Mounting Guide.
  6. Program the card reader address as described here: How to Program Address on a FasCard Reader.

Associated Equipment Models